Practice on Management Methods of Buried Piping in Nuclear Power Plant
-
-
Abstract
The buried piping systems in nuclear power plant and their piping material, protection methods, faliure modes are introduced. From the view of engineering pratice point, the management method combined with engineering practice of buried piping is proposed. The management measures are discussed according the 4 stages of basic stage, inspection stage, repair stage and mitigation stage.
-
-