• 中国核心期刊(遴选)数据库收录期刊
  • 中国科技论文统计源期刊
  • 中国学术期刊综合评价数据库来源期刊
Advanced Search
LU Shuan-lu, LI He-lin, HAN Yong, LUO Fa-qian, ZHOU Jie, WANG Xin-hu. Failure Analysis of IEU Drill Pipes[J]. Corrosion & Protection, 2009, 30(5): 355-357.
Citation: LU Shuan-lu, LI He-lin, HAN Yong, LUO Fa-qian, ZHOU Jie, WANG Xin-hu. Failure Analysis of IEU Drill Pipes[J]. Corrosion & Protection, 2009, 30(5): 355-357.

Failure Analysis of IEU Drill Pipes

More Information
  • Received Date: May 15, 2008
  • Many 127.0 mm×9.19 mm IEU G105 drill pipes failea after 2 367 h of pure drilling time with 8 726 m of penetration footage.The service and loading conditions configuration dimensions,chemical composition,mechanical properties,metallography,macro-fractography,micro-fractography,and corrosion products of the drill pipes were anolyzed.Crack extending velocity of the drill pipe material in corrosion medium was also tested.The results,indicated that the fracfure of the drill pipe resulted from premature corrosion fatigue failure.The failure courses might be as follows: Corrosion pits occurred first at the internal surface in the stress concentrating area of the drill pipe,and then fatigue cracks initiated in pit bottoms,and fractured finally as cracks penetrated through the wall thickness of the drill pipe.The fracture was related to the configuration,material quality and load condition of the drill pipe.
  • [1]
    API Spec 5D Specification for Drill Pipe.Fourth Edition[M].Washington DC: API,1999.
    [2]
    M W Joosten.New study shows how to predict accumulated drill pipe fatigue[J].World Oil,1985(10):21-25.
    [3]
    B A Dale.Inspection interval guidelines to reduce drill string failures[R].SPE17207,1988.

Catalog

    Article views (3) PDF downloads (1) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return