Analyses of Deposits on High Pressure Cylinder of Steam Turbine
-
-
Abstract
The scaling phenomena for the turbine high pressure cylinder of 310 MW subcritical direct air cooling unit,damp,cool 600 MW supercritical units and 660 MW supercritical unit indirect air-cooled were compared.The deposit sample composition was analyzed and the scaling reason was discussed,and some corresponding preventive measures and suggestions were put forward.
-
-